EPRI Subject Search Results

Search Results for "maintenance"

Subject: Insulator maintenance
Prepared By: General Electric Company
Title:

HVDC Wall Bushing Studies. Lenox, Massachusetts July 1990

Report Type: Final Report
Report Number: EL-6923
Project Number: 3039-1

 

Subject: maintenance
Prepared By: Sonalysts Inc, Powerfect Inc
Title:

Feedwater Heaters: Replacement Specification Guidelines. Waterford, Connecticut, Livingston, New Jersey August 1990

Report Type: Final Report
Report Number: GS-6913
Project Number: 2504-5

 

Subject: maintenance
Prepared By: Sonalysts Inc and Powerfect Inc
Title:

Feedwater Heaters Maintenance and Repair Technology: Reducing Outage Cosr. Waterford, Connecticut, Livingston, New Jersey August 1990

Report Type: Final Report
Report Number: GS-6935
Project Number: 2504-5

 

Subject: maintenance
Prepared By: Macrofouling Consultants
Title:

The Zebra Mussel: U.S. Utility Implications. Arlington Texas November 1990

Report Type: Final Report
Report Number: GS-6995
Project Number: 1689-24

 

Subject: maintenance
Prepared By: ARINC Research Corperation
Title:

A Computer-Aided Diagnostic and Troubleshooting System for Fuel Cell Power Plants. Annapolis, Maryland October 1990

Report Type: Final Report
Report Number: GS-7039
Project Number: 3061-3

 

Subject: maintenance
Prepared By: ENCORE Technical Resources, Inc.
Title:

Video Camera Use at Nuclear Power Plants; Tools for Increasing Productivity and Reducing Radiation Exposure. Middletown, Pennsylvania August 1990

Report Type: Final Report
Report Number: NP-6882
Project Number: 2705-13

 

Subject: maintenance
Prepared By: High Voltage Transmission Research Center
Title:

Helicopter-Based Live-Line Work - Volume 1: Helicopter Platform Work Between Phases, Final Report. Lenox, Massachusetts June 1993

Report Type: Final Report
Report Number: TR-102318
Project Number: 2472-06

 

Subject: maintenance
Prepared By: High Voltage Transmission Research Center
Title:

Helicopter-Based Live-Line Work - Volume 2: Bosun's Chair Work Near Suspension Insulators, Final Report. Lenox, Massachusetts June 1993

Report Type: Final Report
Report Number: TR-102318-2
Project Number: 2472-06

 

Subject: maintenance
Prepared By: General Electric Company
Title:

Electrical Performance of a Portable Protective Gap (PPG) in a Compact 550-kV Tower. Lenox, Massachusetts November 1994

Report Type: Final Report
Report Number: TR-103860
Project Number: 2472-06

 

Subject: maintenance
Prepared By: General Electric Company
Title:

Air Gap Sparkover and Gap Factors - Analysis of Published Data. Lenox, Massachusetts December 1994

Report Type: Final Report
Report Number: TR-104437
Project Number: 3787

 

Subject: maintenance
Prepared By: High Voltage Transmission Research Center
Title:

Electrical Performances of Conductive Suits. Lenox, Massachusetts March 1995

Report Type: Final Report
Report Number: TR-104640
Project Number: 2472

 

Subject: maintenance
Prepared By: Science Applications International Corporation
Title:

Quality Assurance Grading Criteria for Plant Systems and Components - Results from a Pilot Plant Project at Grand Gulf Nuclear Station. Fountain Valley, California December 1995

Report Type: Final Report
Report Number: TR-105868
Project Number: 3719-02

 

Subject: maintenance
Prepared By: Electric Power Research Institute
Title:

Proceedings: 1995 Feedwater Heater Technology Symposium. Palo Alto, California December 1995

Report Type: Proceedings
Report Number: TR-105876
Project Number: 2504

 

Subject: Maintenance practices
Prepared By:
Title:

Infrared Thermography Guide.

Report Type:
Report Number: NP-6973s
Project Number:

 

Subject: Nuclear plant operations and maintenance
Prepared By:
Title:

Infrared Thermography Guide.

Report Type:
Report Number: NP-6973s
Project Number:

 

Subject: Preventive maintenance
Prepared By: General Electric Company
Title:

Air Gap Sparkover and Gap Factors - Analysis of Published Data. Lenox, Massachusetts December 1994

Report Type: Final Report
Report Number: TR-104437
Project Number: 3787

 

Subject: Preventive maintenance
Prepared By: General Electric Company
Title:

Electrical Performance of a Portable Protective Gap (PPG) in a Compact 550-kV Tower. Lenox, Massachusetts November 1994

Report Type: Final Report
Report Number: TR-103860
Project Number: 2472-06

 

Subject: Preventive maintenance
Prepared By: High Voltage Transmission Research Center
Title:

Helicopter-Based Live-Line Work - Volume 2: Bosun's Chair Work Near Suspension Insulators, Final Report. Lenox, Massachusetts June 1993

Report Type: Final Report
Report Number: TR-102318-2
Project Number: 2472-06

 

Subject: Preventive maintenance
Prepared By: High Voltage Transmission Research Center
Title:

Helicopter-Based Live-Line Work - Volume 1: Helicopter Platform Work Between Phases, Final Report. Lenox, Massachusetts June 1993

Report Type: Final Report
Report Number: TR-102318
Project Number: 2472-06

 

Subject: Right-of-way Maintenance
Prepared By: Environmental Consultants, Inc.
Title:

Advanced Tree-Trimming Equipment. Southampton, Pennsylvania July 1990

Report Type: Final Report
Report Number: EL-6901
Project Number: 2358-1