EPRI Subject Search Results

Search Results for "Transmission"

Subject: Flexible ac transmission system
Prepared By: Minnesota Power
Title:

An Evaluation of a Thyristor Controlled Phase Angle Regulator Application in the Minnesota Powr Transmission System. Duluth, Minnesota May 1993

Report Type: Final Report
Report Number: TR-101932
Project Number: 3022-13

 

Subject: Flexible ac transmission system
Prepared By: Western Area Power Administration; General Electric
Title:

Thyristor Controller Retrofit Studies for a Western Area Power Administration Phase-Shifting Transformer; Volume 1. Golden, Colorado; Schenectady, New York September 1995

Report Type: Final Report
Report Number: TR-105186-V1
Project Number: 3022-02

 

Subject: Flexible ac transmission system
Prepared By: Western Area Power Administration; General Electric
Title:

Thyristor Controller Retrofit Studies for a Western Area Power Administration Phase-Shifting Transformer; Volume 2. Golden, Colorado; Schenectady, New York September 1995

Report Type: Final Report
Report Number: TR-105186-V2
Project Number: 3022-02

 

Subject: Flexible AC transmission systems
Prepared By: Oregon State University
Title:

Nonlinear Control and Operation of Facts; Methodologies and Basic Concepts. Corvallis, Oregon February 1995

Report Type: Final Report
Report Number: TR-103398
Project Number: 4000-6

 

Subject: HVDC transmission
Prepared By: CEPEL--Centro de Pesquisas de Energia Electrica, University of Wisconsin
Title:

DC Multi-Infeed Study. Rio de Janeiro, Brazil, and Madison, Wisconsin December 1994

Report Type: Final Report
Report Number: TR-104586
Project Number: 2675-04, -05

 

Subject: HVDC transmission lines
Prepared By: GE Industrial and Power Systems
Title:

Advanced HVDC Control - Volume 1: Summary Report. Schenectady, New York September 1994

Report Type: Final Report
Report Number: TR-104227-V1
Project Number: 2675--01

 

Subject: HVDC transmission lines
Prepared By: GE Industrial and Power Systems
Title:

Advanced HVDC Control - Volume 2: Characterization and Mitigation of AC Overvoltages and Distortion at HVDC Terminals. Schenectady, New York September 1994

Report Type: Final Report
Report Number: TR-104227-V2
Project Number: 2675-01

 

Subject: HVDC transmission lines
Prepared By: GE Industrial and Power Systems
Title:

Advanced HVDC Control - Volume 3: Concepts of Stability and Performance Enhancement With Digital Controls for HVDC Systems. Schenectady, New York September 1994

Report Type: Final Report
Report Number: TR-104227-V3
Project Number: 2675-01

 

Subject: HVDC transmission lines
Prepared By: GE Industrial and Power Systems
Title:

Advanced HVDC Control - Volume 4: Characterization and Enhancement of HVDC System Performance During Unbalanced AC Faults. Schenectady, New York September 1994

Report Type: Final Report
Report Number: TR-104227-V4
Project Number: 2675-01

 

Subject: HVDC transmission lines
Prepared By: GE Industrial and Power Systems
Title:

Advanced HVDC Control - Volume 5: Characterization and Enhancement of HVDC System Performance During Single-Pole DC Faults. Schenectady, New York September 1994

Report Type: Final Report
Report Number: TR-104227-V5
Project Number: 2675-01

 

Subject: Overhead ac transmission
Prepared By: Sverdrup Technology
Title:

Upgrade Design for Wood H-Frame Structures Using the EPRI TLWorkstation. Haslet, Texas July 1994

Report Type: Final Report
Report Number: TR-102914
Project Number: 2016

 

Subject: Overhead ac transmission
Prepared By: Washingtom State University
Title:

TLWorkstation Code: Version 2.0 Volume 11: RNOISE Manual. Pullman, Washington June 1990

Report Type: Final Report
Report Number: EL-6420s Volume 10
Project Number: 2025

 

Subject: Overhead ac transmission
Prepared By: Sverdrup Technology, Inc.
Title:

TLWorkstation Code: Version 2.0; Volume 23: ETADS User's Manual. Haslet, Texas July 1990

Report Type: Final Report
Report Number: EL-6420 Volume 23
Project Number: 2016-3

 

Subject: Overhead ac transmission
Prepared By: Georgia Institute of Technology
Title:

TLWorkstation Code: Version 2.0 Volume 8: DYNAMP Manual. Atlanta, Georgia June 1990

Report Type: Final Report
Report Number: EL-6420 Volume 8
Project Number: Project 2546-1

 

Subject: Overhead dc transmission
Prepared By: Sverdrup Technology, Inc.
Title:

TLWorkstation Code: Version 2.0; Volume 23: ETADS User's Manual. Haslet, Texas July 1990

Report Type: Final Report
Report Number: EL-6420 Volume 23
Project Number: 2016-3

 

Subject: Overhead dc transmission
Prepared By: Sverdrup Technology
Title:

Upgrade Design for Wood H-Frame Structures Using the EPRI TLWorkstation. Haslet, Texas July 1994

Report Type: Final Report
Report Number: TR-102914
Project Number: 2016

 

Subject: Overhead transmission
Prepared By: Sverdrup Technology
Title:

Upgrade Design for Wood H-Frame Structures Using the EPRI TLWorkstation. Haslet, Texas July 1994

Report Type: Final Report
Report Number: TR-102914
Project Number: 2016

 

Subject: Overhead transmission
Prepared By: General Electric Company
Title:

Electrical Performance of a Portable Protective Gap (PPG) in a Compact 550-kV Tower. Lenox, Massachusetts November 1994

Report Type: Final Report
Report Number: TR-103860
Project Number: 2472-06

 

Subject: Overhead transmission
Prepared By: Sverdrup Technology, Incorporated
Title:

Considerations for Measuring Wind Loads on Overhead Transmission Line Conductors in Field Conditions. Haslet, Texas December 1994

Report Type: Final Report
Report Number: TR-104478
Project Number: 3748

 

Subject: Overhead transmission
Prepared By: Sverdrup Technology, Incorporated
Title:

Evaluation of the Results of Several Full-Scale Conductor Wind Loading Experiments. Haslet, Texas December 1994

Report Type: Final Report
Report Number: TR-104479
Project Number: 3748

 

Subject: Overhead transmission
Prepared By: Sverdrup Technology, Inc.
Title:

Conductor Wind Loading- Results of EPRI Field Validation Studies. Haslet, Texas December 1994

Report Type: Final Report
Report Number: TR-104480
Project Number: 3748

 

Subject: Overhead transmission
Prepared By: Sverdrup Technology, Inc.
Title:

TLWorkstation Code: Version 2.0; Volume 23: ETADS User's Manual. Haslet, Texas July 1990

Report Type: Final Report
Report Number: EL-6420 Volume 23
Project Number: 2016-3

 

Subject: Overhead transmission
Prepared By: Colorado State University
Title:

Reliability-Based Design of Transmission Line Structures: Final Report Volume 1: Methods. Fort Collins, Colorado March 1987

Report Type: Final Report
Report Number: EL-4793 Volume 1
Project Number: Project 1352-2

 

Subject: Overhead transmission
Prepared By: Colorado State University
Title:

Reliability-Based Design of Transmission Line Structures: Final Report Volume 2: Appendixes. Fort Collins, Colorado Mach 1987

Report Type: Final Report
Report Number: EL-4793 Volume 2
Project Number: Project 1352-2

 

Subject: Overhead transmission
Prepared By: Washingtom State University
Title:

TLWorkstation Code: Version 2.0 Volume 11: RNOISE Manual. Pullman, Washington June 1990

Report Type: Final Report
Report Number: EL-6420s Volume 10
Project Number: 2025

 

Subject: Overhead transmission
Prepared By: Environmental Consultants, Inc.
Title:

Advanced Tree-Trimming Equipment. Southampton, Pennsylvania July 1990

Report Type: Final Report
Report Number: EL-6901
Project Number: 2358-1

 

Subject: Overhead Transmission Lines
Prepared By: High Voltage Transmission Research Center
Title:

Helicopter-Based Live-Line Work - Volume 1: Helicopter Platform Work Between Phases, Final Report. Lenox, Massachusetts June 1993

Report Type: Final Report
Report Number: TR-102318
Project Number: 2472-06

 

Subject: Overhead Transmission Lines
Prepared By: High Voltage Transmission Research Center
Title:

Helicopter-Based Live-Line Work - Volume 2: Bosun's Chair Work Near Suspension Insulators, Final Report. Lenox, Massachusetts June 1993

Report Type: Final Report
Report Number: TR-102318-2
Project Number: 2472-06

 

Subject: Overhead Transmission Lines
Prepared By: Mississippi State University
Title:

Improved Ammoniacal Copper Carboxylate Wood Preservative. Mississippi State, Mississippi September 1995

Report Type: Final Report
Report Number: TR-105372
Project Number: 1528-05

 

Subject: Transmission
Prepared By: Zadeh Meyer Engineerng, Inc.
Title:

Proceedings: Forum on Ancillary Services. 18371 Seventeenth Street, Santa Ana, California 92705 Septembre 1995

Report Type: Proceedings
Report Number: TR-105686
Project Number: 4169

 

Subject: Transmission
Prepared By: CSA Energy Consultants; Putnam, Hayes, and Bartlett
Title:

Transmission Services Costing Framework; Volume 1: Technical and Economic Fundamentals. Arlington, Virginia; Washington, DC April 1995

Report Type: Final Report
Report Number: TR-105121-V1
Project Number: 3216-01

 

Subject: Transmission
Prepared By: CSA Energy Consultants; Putnam, Hayes and Bartlett
Title:

Transmission Services Costing Framework; Volume 2: Framework Description and Application. Arlington, Virginia; Washington, DC April 1995

Report Type: Final Report
Report Number: TR-105121-V2
Project Number: 3216-01

 

Subject: Transmission
Prepared By:
Title:

Electromagnetic Transients Program (EMTP) Field Comparisons.

Report Type:
Report Number: EL-6768s
Project Number:

 

Subject: Transmission
Prepared By: ABB Power Systems, Inc & Southern Electric International
Title:

DSM: Transmission and Distribution Impacts Vol. 1: Analysis Framework and Test Case. Pittsburgh, Pennslyvania & Atlanta, Georgia August 1990

Report Type: Final Report
Report Number: CU-6924 Vol. 1
Project Number: 2548-1

 

Subject: Transmission
Prepared By: ABB Power Systems, Inc.
Title:

DSM: Transmission and Distribution Impacts Vol. 2: Application on Spatial Frequency Analysis. Pittsburgh, Pennslyvania August 1990

Report Type: Final Report
Report Number: CU-6924 Vol. 2
Project Number: 2548-1

 

Subject: Transmission cables
Prepared By: Underground Systems, Inc.
Title:

Overload Characteristics of Paper-Polypropylene-Paper Cable. Armonk, New York September 1990

Report Type: Final Report
Report Number: EL-6929
Project Number: 7880-2

 

Subject: Transmission cables
Prepared By: Underground Systems, Inc.
Title:

Overload Characteristics of Paper-Polyproplene-Paper Cable. Armonk, New York September 1990

Report Type: Final Report
Report Number: EL-6929 (2)
Project Number: 7880-2

 

Subject: Transmission cables
Prepared By: Pirelli Cable Corporation
Title:

Development of 230-kV High Pressure, Gas-Filled, Pipe-Type Cable System: Model Test Program Phase. Florham Park, New Jersey September 1990

Report Type: Interim Report
Report Number: EL-6933
Project Number: 7908-1

 

Subject: Transmission costs
Prepared By: Incentives Research Inc.
Title:

A Primer on Electric Power Flow for Economists and Utility Planners. Boston, Massachusetts February 1995

Report Type: Final Report
Report Number: TR-104604
Project Number: 2123-19

 

Subject: Transmission line towers
Prepared By: Cornell University
Title:

Experimental Study of Undrained Behavior of Drilled Shafts During Static And Cyclic Inclined Loading. Ithica, New York July 1995

Report Type: Final Report
Report Number: TR-104999
Project Number: 1493-04

 

Subject: Transmission line towers
Prepared By: Cornell University
Title:

Reliability- Based Design of Foundations for Transmission Line Structures. Ithaca, New York July 1995

Report Type: Final Report
Report Number: TR-105000
Project Number: 1493-04

 

Subject: Transmission line towers
Prepared By: Cornell University
Title:

Case History Evaluation of the Behavior of Drilled Shafts Under Axial and Lateral Loading. Ithaca, New York December 1994

Report Type: Final Report
Report Number: TR-104601
Project Number: 1493-04

 

Subject: Transmission line towers
Prepared By: BIRL Northwestern University
Title:

Mutual Design: Overhead Transmission Lines and Railroad Facilities Susceptibility Program Phase II; volumes 1-3. Evanston, Illinois September 1995

Report Type: Final Report
Report Number: TR-103945
Project Number: 1902-07

 

Subject: Transmission lines
Prepared By: Sverdrup Technology
Title:

Upgrade Design for Wood H-Frame Structures Using the EPRI TLWorkstation. Haslet, Texas July 1994

Report Type: Final Report
Report Number: TR-102914
Project Number: 2016

 

Subject: Transmission lines
Prepared By: Sverdrup Technology, Incorporated
Title:

Evaluation of the Results of Several Full-Scale Conductor Wind Loading Experiments. Haslet, Texas December 1994

Report Type: Final Report
Report Number: TR-104479
Project Number: 3748

 

Subject: Transmission lines
Prepared By: Sverdrup Technology, Incorporated
Title:

Considerations for Measuring Wind Loads on Overhead Transmission Line Conductors in Field Conditions. Haslet, Texas December 1994

Report Type: Final Report
Report Number: TR-104478
Project Number: 3748

 

Subject: Transmission lines
Prepared By: Enertech Consultants
Title:

RESICALC 2.1 Residual Magnetic Field Modeling Program: An Addendum to the RESICALC 2.0 User's Manual. Campbell, California November 1995

Report Type: Interim
Report Number: TR-104274-P1
Project Number: 4320-01

 

Subject: Transmission lines
Prepared By: Cornell University
Title:

Case History Evaluation of the Behavior of Drilled Shafts Under Axial and Lateral Loading. Ithaca, New York December 1994

Report Type: Final Report
Report Number: TR-104601
Project Number: 1493-04

 

Subject: Transmission lines
Prepared By: Sverdrup Technology, Inc.
Title:

Conductor Wind Loading- Results of EPRI Field Validation Studies. Haslet, Texas December 1994

Report Type: Final Report
Report Number: TR-104480
Project Number: 3748

 

Subject: Transmission lines
Prepared By: Enertech Consultants, & Ohio State University
Title:

SUBCALC 2.0 Substation Magnetic Field Modeling Program: User's Manual. Campbell, California, Columbus, Ohio November 1995

Report Type: Computer Code Manual
Report Number: TR-105506
Project Number: 4320-01

 

Subject: Transmission lines
Prepared By: Cornell University
Title:

Field Evaluation of Grillage Foundation Uplift Capacity. Ithaca, New York August 1990

Report Type: Final Report
Report Number: EL-6965
Project Number: 1493-4

 

Subject: Transmission lines
Prepared By: Cornell University
Title:

Manual on Estimating Soil Properties for Foundation Design. Ithaca, New York August 1990

Report Type: Final Report
Report Number: EL-6800
Project Number: 1493-6

 

Subject: Transmission lines
Prepared By: Washingtom State University
Title:

TLWorkstation Code: Version 2.0 Volume 11: RNOISE Manual. Pullman, Washington June 1990

Report Type: Final Report
Report Number: EL-6420s Volume 10
Project Number: 2025

 

Subject: Transmission lines
Prepared By: Colorado State University
Title:

Reliability-Based Design of Transmission Line Structures: Final Report Volume 1: Methods. Fort Collins, Colorado March 1987

Report Type: Final Report
Report Number: EL-4793 Volume 1
Project Number: Project 1352-2

 

Subject: Transmission lines
Prepared By: Colorado State University
Title:

Reliability-Based Design of Transmission Line Structures: Final Report Volume 2: Appendixes. Fort Collins, Colorado Mach 1987

Report Type: Final Report
Report Number: EL-4793 Volume 2
Project Number: Project 1352-2

 

Subject: Transmission lines
Prepared By: Cornell University
Title:

TLWorkstation Code: Version 2.0 Volume 16: CUFAD Manual. Ithaca, New York June 1990

Report Type: Final Report
Report Number: EL-6420 Volume 16
Project Number: 1493-6

 

Subject: Transmission lines
Prepared By: Sverdrup Technology, Inc.
Title:

TLWorkstation Code: Version 2.0; Volume 23: ETADS User's Manual. Haslet, Texas July 1990

Report Type: Final Report
Report Number: EL-6420 Volume 23
Project Number: 2016-3

 

Subject: Transmission lines
Prepared By: Georgia Institute of Technology
Title:

TLWorkstation Code: Version 2.0 Volume 8: DYNAMP Manual. Atlanta, Georgia June 1990

Report Type: Final Report
Report Number: EL-6420 Volume 8
Project Number: Project 2546-1

 

Subject: Transmission lines
Prepared By: GAI Consultants, Inc
Title:

TLWorkstation Code: Version 2.0 Volume 17: MFAD Manual. Monroeville, Pennsylvania June 1990

Report Type: Final Report
Report Number: EL-6420 Volume 17
Project Number: 1493-7

 

Subject: Transmission Liness
Prepared By: GAI Consultants, Inc.
Title:

Direct Embedment Foundation Research: Load Tst Summaries. Monroeville, Pennsylvania June 1990

Report Type: Final Report
Report Number: EL-6849
Project Number: 1280-7

 

Subject: Transmission substations
Prepared By: Angevine Acoustical Consultants, Inc.
Title:

Active Cancellation of Transformer Noise; Volumes 1-3. East Aurora, New York October 1995

Report Type: Final Report
Report Number: TR-102924
Project Number: 2744-01

 

Subject: Transmission substations
Prepared By: Power Technologies, Inc.
Title:

Scoping Study: Substation Design Workstation. Wilmerding, Pennsylvania March 1993

Report Type: Final Report
Report Number: TR-101792
Project Number: 3191-01

 

Subject: Transmission substations
Prepared By: The Department of Electrical Engineering
Title:

Dynamic Brake Control. Montana State University September 1994

Report Type: Final Report
Report Number: TR-103902
Project Number: 2473-39

 

Subject: Transmission Towers
Prepared By: Sverdrup Technology, Incorporated
Title:

Considerations for Measuring Wind Loads on Overhead Transmission Line Conductors in Field Conditions. Haslet, Texas December 1994

Report Type: Final Report
Report Number: TR-104478
Project Number: 3748

 

Subject: Transmission Towers
Prepared By: Sverdrup Technology, Incorporated
Title:

Evaluation of the Results of Several Full-Scale Conductor Wind Loading Experiments. Haslet, Texas December 1994

Report Type: Final Report
Report Number: TR-104479
Project Number: 3748

 

Subject: Transmission Towers
Prepared By: Cornell University
Title:

Summary of Transmission Line Structure Foundation Research. Ithaca, New York September 1995

Report Type: Final Report
Report Number: TR-105206
Project Number: 1493-04

 

Subject: Transmission Towers
Prepared By: Sverdrup Technology, Inc.
Title:

Conductor Wind Loading- Results of EPRI Field Validation Studies. Haslet, Texas December 1994

Report Type: Final Report
Report Number: TR-104480
Project Number: 3748

 

Subject: Transmission Towers
Prepared By: GAI Consultants, Inc.
Title:

Direct Embedment Foundation Research: Load Tst Summaries. Monroeville, Pennsylvania June 1990

Report Type: Final Report
Report Number: EL-6849
Project Number: 1280-7

 

Subject: Transmission Towers
Prepared By: Cornell University
Title:

Manual on Estimating Soil Properties for Foundation Design. Ithaca, New York August 1990

Report Type: Final Report
Report Number: EL-6800
Project Number: 1493-6

 

Subject: Transmission Towers
Prepared By: Cornell University
Title:

Field Evaluation of Grillage Foundation Uplift Capacity. Ithaca, New York August 1990

Report Type: Final Report
Report Number: EL-6965
Project Number: 1493-4

 

Subject: Transmission Towers
Prepared By: GAI Consultants, Inc
Title:

TLWorkstation Code: Version 2.0 Volume 17: MFAD Manual. Monroeville, Pennsylvania June 1990

Report Type: Final Report
Report Number: EL-6420 Volume 17
Project Number: 1493-7

 

Subject: Transmission Towers
Prepared By: Sverdrup Technology, Inc.
Title:

TLWorkstation Code: Version 2.0; Volume 23: ETADS User's Manual. Haslet, Texas July 1990

Report Type: Final Report
Report Number: EL-6420 Volume 23
Project Number: 2016-3

 

Subject: Transmission Towers
Prepared By: Cornell University
Title:

TLWorkstation Code: Version 2.0 Volume 16: CUFAD Manual. Ithaca, New York June 1990

Report Type: Final Report
Report Number: EL-6420 Volume 16
Project Number: 1493-6

 

Subject: Transmission Towers
Prepared By: Colorado State University
Title:

Reliability-Based Design of Transmission Line Structures: Final Report Volume 2: Appendixes. Fort Collins, Colorado Mach 1987

Report Type: Final Report
Report Number: EL-4793 Volume 2
Project Number: Project 1352-2

 

Subject: Transmission Towers
Prepared By: Colorado State University
Title:

Reliability-Based Design of Transmission Line Structures: Final Report Volume 1: Methods. Fort Collins, Colorado March 1987

Report Type: Final Report
Report Number: EL-4793 Volume 1
Project Number: Project 1352-2

 

Subject: Underground transmission
Prepared By: Pirelli Cable Corporation
Title:

Development of 230-kV High Pressure, Gas-Filled, Pipe-Type Cable System: Model Test Program Phase. Florham Park, New Jersey September 1990

Report Type: Interim Report
Report Number: EL-6933
Project Number: 7908-1

 

Subject: Underground transmission
Prepared By: Underground Systems, Inc.
Title:

Overload Characteristics of Paper-Polyproplene-Paper Cable. Armonk, New York September 1990

Report Type: Final Report
Report Number: EL-6929 (2)
Project Number: 7880-2

 

Subject: Underground transmission
Prepared By: Underground Systems, Inc.
Title:

Overload Characteristics of Paper-Polypropylene-Paper Cable. Armonk, New York September 1990

Report Type: Final Report
Report Number: EL-6929
Project Number: 7880-2