EPRI Subject Search Results

Search Results for "Testing"

Subject: Battery testing
Prepared By: Electrotek Concepts, Inc.
Title:

Evaluation of Electric Vehicle Battery Systems Through In-Vehicle Testing; Fifth Annual Report. Chattanooga, Tennessee July 1990

Report Type: Final Report
Report Number: CU-6888
Project Number: 1136-33

 

Subject: Battery testing
Prepared By: Argonne National Laboratory
Title:

Electric Vehicle Battery Testing and Development at Argonne National Laboratory 1989 Annual Report. Argonne, Illinois September 1990

Report Type: Final Report
Report Number: CU-6968
Project Number: 2216-2

 

Subject: Battery testing
Prepared By: Argonne National Laboratory
Title:

Electric Vehicle battery Testing and Development at Argonne National Laboratory. Argonne, Illinois September 1990

Report Type: Final Report
Report Number: CU-6968 (2)
Project Number: 2216-2

 

Subject: Corrosion testing
Prepared By: Westinghouse Electric Corporatoin
Title:

Corrosion Evallluation of Thermally Treated Alloy 600 Tubing in Primary and Faulted Secondary Water Environments. Pittsburgh, Pennslvania June 1990

Report Type: Final Report
Report Number: NP-6721-M
Project Number: 1708-2

 

Subject: Eddy-current testing
Prepared By: EPRI
Title:

Nondestructive Evaluation Research Progress in 1989: Proceedings from the Tenth Annual EPRI NDE Information Meeting. Palo Alto, California June 1990

Report Type: Proceedings
Report Number: NP-6609
Project Number:

 

Subject: Eddy-current testing
Prepared By: J. A. Jones Applied Research Company
Title:

Operation of the EPRI Nondestructive Evaluation Center: 1989 Annual Report. Charlotte, North Carolina September 1990

Report Type: Final Report
Report Number: NP-7007
Project Number: 1570-2

 

Subject: Field testing
Prepared By: The Fleming Group
Title:

Field Testing of a Dual-Fuel Rooftop Heat Pump. East Syracuse, New York December 1990

Report Type: Final Report
Report Number: CU-7084
Project Number: 2891-6

 

Subject: Fireside Testing
Prepared By: Electric Power Technologies, Inc., Southern Research Institute, Energy and Environmental Research Co
Title:

Coal Quality Field Test at Northeastern Unit 4 of Public Service Company of Oklahoma. Menlo Park, California; Birmingham, Alabama; Orriville, Ohio; Birmingham, Alabama; Laguna Hill, California October 1995

Report Type: Final Report
Report Number: TR-105565
Project Number: 1400-25

 

Subject: Magnetic testing
Prepared By: EPRI
Title:

Nondestructive Evaluation Research Progress in 1989: Proceedings from the Tenth Annual EPRI NDE Information Meeting. Palo Alto, California June 1990

Report Type: Proceedings
Report Number: NP-6609
Project Number:

 

Subject: Materials testing
Prepared By: University of Illinois
Title:

Device-Grade Hydrogenated Amorphous Silicon Produced by dc Magnetron Reactive Sputtering. Urbana, Illinios October 1990

Report Type: Interim
Report Number: GS-7012
Project Number: 2824-1

 

Subject: Materials testing
Prepared By: J.A. Jones Applied Research Company
Title:

Proceedings: Steeam Turbine/ Generator NDE Workshop. Charlotte, North Carolina November 1990

Report Type: Proceedings
Report Number: NP-6993
Project Number: 1570-2

 

Subject: Nondestructing testing
Prepared By: Weidlinger Associates
Title:

Ultrasonic Wave Propagation in Reactor Pressure Vessel Cladded Interfaces. Los Altos. Caliornia November 1990

Report Type: Final Report
Report Number: NP-6974
Project Number: 2687-8

 

Subject: Nondestructive testing
Prepared By: EPRI
Title:

Nondestructive Evaluation Research Progress in 1989: Proceedings from the Tenth Annual EPRI NDE Information Meeting. Palo Alto, California June 1990

Report Type: Proceedings
Report Number: NP-6609
Project Number:

 

Subject: Nondestructive testing
Prepared By: VinTek Inc
Title:

BWR Nondestructive Evaluation Source Book. Richland, Washington June 1990

Report Type: Final Report
Report Number: NP-6879-D
Project Number: 1570-28

 

Subject: Nondestructive testing
Prepared By: J.A. Jones Applied Research Company
Title:

Proceedings: Steeam Turbine/ Generator NDE Workshop. Charlotte, North Carolina November 1990

Report Type: Proceedings
Report Number: NP-6993
Project Number: 1570-2

 

Subject: Nondestructive testing
Prepared By: J. A. Jones Applied Research Company
Title:

Operation of the EPRI Nondestructive Evaluation Center: 1989 Annual Report. Charlotte, North Carolina September 1990

Report Type: Final Report
Report Number: NP-7007
Project Number: 1570-2

 

Subject: Nondestructive testing
Prepared By: Electric Power Research Institute
Title:

Proceedings: 1995 Feedwater Heater Technology Symposium. Palo Alto, California December 1995

Report Type: Proceedings
Report Number: TR-105876
Project Number: 2504

 

Subject: Performance testing
Prepared By: Plant Performance
Title:

Proceedings: 1989 EPRI Heat-Rate Improvement Conference. Knoxville, Tennessee September 1990

Report Type: Proceedings
Report Number: GS-6985
Project Number: 1711-10

 

Subject: Performance testing
Prepared By: ENCOR-AMERICA INC
Title:

Proceedings: 1991 EPRI Heat-Rate Improvement Conference. Mountain View, California July 1992

Report Type: Proceedings
Report Number: TR-100901
Project Number:

 

Subject: Substation equipment testing
Prepared By: Electric Power Research Institute
Title:

Workshop Proceedings: Advanced Diagnostics for Substation Equipment. Palo Alto, California May 1993

Report Type: Proceedings
Report Number: TR-102450
Project Number: 2747

 

Subject: Testing
Prepared By: Cornell University
Title:

Manual on Estimating Soil Properties for Foundation Design. Ithaca, New York August 1990

Report Type: Final Report
Report Number: EL-6800
Project Number: 1493-6

 

Subject: Testing
Prepared By: GAI Consultants, Inc.
Title:

Direct Embedment Foundation Research: Load Tst Summaries. Monroeville, Pennsylvania June 1990

Report Type: Final Report
Report Number: EL-6849
Project Number: 1280-7

 

Subject: Testing
Prepared By: Cornell University
Title:

Field Evaluation of Grillage Foundation Uplift Capacity. Ithaca, New York August 1990

Report Type: Final Report
Report Number: EL-6965
Project Number: 1493-4

 

Subject: Ultrasonic testing
Prepared By: EPRI
Title:

Nondestructive Evaluation Research Progress in 1989: Proceedings from the Tenth Annual EPRI NDE Information Meeting. Palo Alto, California June 1990

Report Type: Proceedings
Report Number: NP-6609
Project Number:

 

Subject: Ultrasonic testing
Prepared By: VinTek Inc
Title:

BWR Nondestructive Evaluation Source Book. Richland, Washington June 1990

Report Type: Final Report
Report Number: NP-6879-D
Project Number: 1570-28

 

Subject: Ultrasonic testing
Prepared By: Westinghouse Electric Corporatoin
Title:

Inspection Accessibility Study of the Millstone Unit 1 Reactor Pressure Vessel. Pittsburgh, Pennslvania July 1990

Report Type: Final Report
Report Number: NP-6899-D Volume 1
Project Number: C105-1

 

Subject: Ultrasonic testing
Prepared By: Westinghouse Electric Corporatoin
Title:

Inspection Accessibility Study of the Millstone Unit 1 Reactor Pressure Vessel. Pittsburgh, Pennslvania July 1990

Report Type: Final Report
Report Number: NP-6899-D Volume 2
Project Number: C105-1

 

Subject: Ultrasonic testing
Prepared By: Weidlinger Associates
Title:

Ultrasonic Wave Propagation in Reactor Pressure Vessel Cladded Interfaces. Los Altos. Caliornia November 1990

Report Type: Final Report
Report Number: NP-6974
Project Number: 2687-8

 

Subject: Ultrasonic testing
Prepared By: J. A. Jones Applied Research Company
Title:

Operation of the EPRI Nondestructive Evaluation Center: 1989 Annual Report. Charlotte, North Carolina September 1990

Report Type: Final Report
Report Number: NP-7007
Project Number: 1570-2

 

Subject: Ultrasonic testing
Prepared By: J. A. Jones Applied Research Company
Title:

Assessment of Typical BWR Vessel Configurations adn Examination Coverage. Charlotte, North Carolina October 1990

Report Type: Topical Report
Report Number: NP-7026-D
Project Number: 3232-1