Subject: |
Human Reliability |
|
Prepared By: |
NUS Corporation |
Title: |
Operator Reliability Experiments Using Power Plant Simulators Volume 1: Executive Summary. Gaithersburg, Maryland July 1990 |
Report Type: |
Final Report |
Report Number: |
NP-6937 Volume 1 |
Project Number: |
2847-1 |
|
Subject: |
Human Reliability |
|
Prepared By: |
NUS Corporation |
Title: |
Operator Reliability Experiments Using Power Plant Simulators Volume 2: Technical Report. Gaithersberg, Maryland July 1990 |
Report Type: |
Final Report |
Report Number: |
NP-6937 Volume 2 |
Project Number: |
2847-1 |
|
Subject: |
Human Reliability |
|
Prepared By: |
Halliburton Nus, & University of Maryland |
Title: |
Control Room Crew Operations Research Project. Gaithersburg, Maryland, College Park, Maryland December 1995 |
Report Type: |
Final Report |
Report Number: |
TR-105280 |
Project Number: |
8013-04 |
|
Subject: |
Power System Reliability |
|
Prepared By: |
RCG/Hagler, Bailly, Inc. |
Title: |
Cost-Benefit Analysis of Power System Reliability: Determination of Interruption Costs Volume 3: Measurement of Interruption Costs for a Major Southeast Utility. Washington, D.C. May 1990 |
Report Type: |
Final Report |
Report Number: |
EL-6791 Volume 3 |
Project Number: |
2878-1 |
|
Subject: |
Reliability |
|
Prepared By: |
Colorado State University |
Title: |
Reliability-Based Design of Transmission Line Structures: Final Report Volume 1: Methods. Fort Collins, Colorado March 1987 |
Report Type: |
Final Report |
Report Number: |
EL-4793 Volume 1 |
Project Number: |
Project 1352-2 |
|
Subject: |
Reliability |
|
Prepared By: |
Colorado State University |
Title: |
Reliability-Based Design of Transmission Line Structures: Final Report Volume 2: Appendixes. Fort Collins, Colorado Mach 1987 |
Report Type: |
Final Report |
Report Number: |
EL-4793 Volume 2 |
Project Number: |
Project 1352-2 |
|
Subject: |
Reliability |
|
Prepared By: |
Weidlinger Associates |
Title: |
Ultrasonic Wave Propagation in Reactor Pressure Vessel Cladded Interfaces. Los Altos. Caliornia November 1990 |
Report Type: |
Final Report |
Report Number: |
NP-6974 |
Project Number: |
2687-8 |
|
Subject: |
Reliability |
|
Prepared By: |
Sonalysts Inc, Powerfect Inc |
Title: |
Feedwater Heaters: Replacement Specification Guidelines. Waterford, Connecticut, Livingston, New Jersey August 1990 |
Report Type: |
Final Report |
Report Number: |
GS-6913 |
Project Number: |
2504-5 |
|
Subject: |
Reliability |
|
Prepared By: |
Niagra Mohawk Power Corporation & Science Applications International Corporation & Stone and Webste |
Title: |
Control Upgrade Study for Huntley Unit 65 Vol. 1: Executive Summary. August 1990 |
Report Type: |
Final Report |
Report Number: |
GS-6961 Vol. 1 |
Project Number: |
2710-11 |
|
Subject: |
Reliability |
|
Prepared By: |
Niagra Mohawk Power Corporation & Science Applications International Corporation |
Title: |
Control Upgrade Study for Huntley Unit 65 Vol. 2: Reliability, Availability, and Maintainability. Syracuse, New York & Idaho Falls, Idaho August 1990 |
Report Type: |
Final Report |
Report Number: |
GS-6961 Vol. 2 |
Project Number: |
2710-11 |
|
Subject: |
Reliability |
|
Prepared By: |
Science Applications International Corporation |
Title: |
A RAM Analysis of Consolidated Edison's Gowanus and Narrow Gas Turbine Power Plants. Los Altos, California December 1990 |
Report Type: |
Final Report |
Report Number: |
GS-7087 |
Project Number: |
2989-2 |
|
Subject: |
Reliability |
|
Prepared By: |
Electrotek Concepts, Inc. |
Title: |
Engineering Handbook for Dispersed Energy Systems on Utility Distribution Systems. Knoxville, Tennessee November 1995 |
Report Type: |
Final Report |
Report Number: |
TR-105589 |
Project Number: |
4524-01 |
|
Subject: |
Reliability |
|
Prepared By: |
Science Applications International Corporation |
Title: |
Quality Assurance Grading Criteria for Plant Systems and Components - Results from a Pilot Plant Project at Grand Gulf Nuclear Station. Fountain Valley, California December 1995 |
Report Type: |
Final Report |
Report Number: |
TR-105868 |
Project Number: |
3719-02 |
|
Subject: |
Reliability |
|
Prepared By: |
Foster-Miller, Inc. |
Title: |
Improvement of Cable Connector Reliability. Waltham, Massachusetts August 1995 |
Report Type: |
Final Report |
Report Number: |
TR-105047 |
Project Number: |
3927-03 |
|
Subject: |
Reliability |
|
Prepared By: |
SoHaR Incorporated |
Title: |
Verification and Validation Guidelines for High Integrity Systems - Volume 1: Main Report. Beverly Hills, California December 1995 |
Report Type: |
Final Report |
Report Number: |
TR-103916-V1 |
Project Number: |
3352-01 |
|
Subject: |
Reliability analysis |
|
Prepared By: |
University of Oklahoma |
Title: |
Multi-Area Power System Reliability and Production Costing. Norman, Oklahoma August 1990 |
Report Type: |
Final Report |
Report Number: |
EL-6912 |
Project Number: |
2473-18 |
|
Subject: |
Service Reliability |
|
Prepared By: |
Environmental Consultants, Inc. |
Title: |
Advanced Tree-Trimming Equipment. Southampton, Pennsylvania July 1990 |
Report Type: |
Final Report |
Report Number: |
EL-6901 |
Project Number: |
2358-1 |
|
Subject: |
Steady state reliability |
|
Prepared By: |
Power Systems Research Inc. |
Title: |
Development of a Composite System Reliability Evaluation Program Volume 1: Methodology and Project Results. New York, New York August 1990 |
Report Type: |
Final Report |
Report Number: |
EL-6926 Volume 1 |
Project Number: |
2581-2 |
|
Subject: |
Steady-state reliability |
|
Prepared By: |
Power Systems Research Inc. |
Title: |
Development of a Composite System Reliability Evaluation Program vol.2:Mathematical Models and Computational Aspects. New York, New York August 1990 |
Report Type: |
Final Report |
Report Number: |
EL-6926 Volume 2 |
Project Number: |
2581-2 |
|
Subject: |
Steaty-state reliability |
|
Prepared By: |
Power Systems Research Inc. |
Title: |
Development of a Composite System Reliability Evaluation Program vol.3 User Manual and Instiation Notes. New York, New York August 1990 |
Report Type: |
Final Report |
Report Number: |
EL-6926 Volume 3 |
Project Number: |
2581-2 |
|
Subject: |
Transformer reliability |
|
Prepared By: |
Electric Power Research Institute |
Title: |
Workshop Proceedings: Static Electrification in Power Transformers. Palo Alto, California July 1990 |
Report Type: |
Proceedings |
Report Number: |
EL-6918 |
Project Number: |
1499-98 |
|
Subject: |
Transformer reliability |
|
Prepared By: |
Cooper Industries Inc. |
Title: |
Static Electrification in the External Oil Circulation System of Power Transformers. Franksville, Wisconsin 53126 March 1995 |
Report Type: |
Final Report |
Report Number: |
TR-102112 |
Project Number: |
1499-16 |
|
Subject: |
Transformer reliability |
|
Prepared By: |
Electric Power Research Institute |
Title: |
Proceedings: Static Electrification in Power Transformers. Palo Alto, California June 1993 |
Report Type: |
Proceedings |
Report Number: |
TR-102480 |
Project Number: |
1499-99 |
|
Subject: |
Transformer reliability |
|
Prepared By: |
Massachusetts Institute of Technology |
Title: |
Flow Induced Electrification of Liquid Insulated Electrical Equipment. Cambridge, Massachusetts May 1995 |
Report Type: |
Final Report |
Report Number: |
TR-104973 |
Project Number: |
RP3334-01 |
|
Subject: |
Transformer reliability |
|
Prepared By: |
Westing House Electric Corporation, |
Title: |
Power Transformer Tank Rupture: Risk Assessment and Mitigation. Pittsburgh, Pennsylvania April 1995 |
Report Type: |
Final Report |
Report Number: |
TR-104994 |
Project Number: |
3212-01 |
|
Subject: |
Transformer reliability |
|
Prepared By: |
Electric Power Research Institute |
Title: |
Proceedings: Static Electrification in Power Transformers. Palo Alto, California May 1995 |
Report Type: |
Proceedings |
Report Number: |
TR-105019 |
Project Number: |
3334-78 |
|