Subject: |
Combined-cycle Power Plants |
|
Prepared By: |
Energy Storage and Power Consultants |
Title: |
CAES Plant With Stream Generation: Preliminary Design and Cost Analysis. Mountainside, New Jersy October 1990 |
Report Type: |
Final Report |
Report Number: |
GS-6987 |
Project Number: |
2676-3 |
|
Subject: |
Combined-cycle Power Plants |
|
Prepared By: |
Energy Storage and Power Consultants |
Title: |
CAES Plant With Steam Generation: Preliminary Design and Cost Analysis. Mountainside, New Jersey October 1990 |
Report Type: |
Final Report |
Report Number: |
GS-6987 (2) |
Project Number: |
2676-3 |
|
Subject: |
Combined-cycle Power Plants |
|
Prepared By: |
Science Applications International Corporation |
Title: |
A RAM Analysis of Consolidated Edison's Gowanus and Narrow Gas Turbine Power Plants. Los Altos, California December 1990 |
Report Type: |
Final Report |
Report Number: |
GS-7087 |
Project Number: |
2989-2 |
|
Subject: |
Compressed-air energy storage plants |
|
Prepared By: |
Energy Storage and Power Consultants |
Title: |
CAES Plant With Steam Generation: Preliminary Design and Cost Analysis. Mountainside, New Jersey October 1990 |
Report Type: |
Final Report |
Report Number: |
GS-6987 (2) |
Project Number: |
2676-3 |
|
Subject: |
Compressed-air energy storage plants |
|
Prepared By: |
Energy Storage and Power Consultants |
Title: |
CAES Plant With Stream Generation: Preliminary Design and Cost Analysis. Mountainside, New Jersy October 1990 |
Report Type: |
Final Report |
Report Number: |
GS-6987 |
Project Number: |
2676-3 |
|
Subject: |
Demonstration Plants |
|
Prepared By: |
Shell Development Company |
Title: |
Shell Coal Gasification Project: Gasification of Six Diverse Coals. Houston, Texas November 1990 |
Report Type: |
Interim |
Report Number: |
GS-7051 |
Project Number: |
2695-1 |
|
Subject: |
Demonstration Plants |
|
Prepared By: |
Cool Water Gasification Program and Radian Corp. |
Title: |
Cool Water Coal Gasification Program:Final Report. Daggett,California and Austin, Texas December 1990 |
Report Type: |
Final Report |
Report Number: |
GS-6806 |
Project Number: |
1459 |
|
Subject: |
Electric power plants |
|
Prepared By: |
Ontario Hydro and Rensselear Polytechnic Institute |
Title: |
Surge Protection of Generators. Toronto, Ontario,Canada: Troy, New York October 1990 |
Report Type: |
Final Report |
Report Number: |
GS-6936 |
Project Number: |
2594-1 |
|
Subject: |
Electric power plants |
|
Prepared By: |
|
Title: |
Surge Protection of Generators. October 1990 |
Report Type: |
Final Report |
Report Number: |
GS-6936 (2) |
Project Number: |
2594-1 |
|
Subject: |
Fossil fuel power plants |
|
Prepared By: |
Daedalus Associates Inc, El international |
Title: |
Life Optimization for Fossil Fuel Power Plants. November 1990 |
Report Type: |
Final Report |
Report Number: |
GS-7064 |
Project Number: |
2596-10 |
|
Subject: |
Fossil fuel power plants |
|
Prepared By: |
Niagra Mohawk Power Corporation & Science Applications International Corporation & Stone and Webste |
Title: |
Control Upgrade Study for Huntley Unit 65 Vol. 1: Executive Summary. August 1990 |
Report Type: |
Final Report |
Report Number: |
GS-6961 Vol. 1 |
Project Number: |
2710-11 |
|
Subject: |
Fossil fuel power plants |
|
Prepared By: |
Niagra Mohawk Power Corporation & Science Applications International Corporation |
Title: |
Control Upgrade Study for Huntley Unit 65 Vol. 2: Reliability, Availability, and Maintainability. Syracuse, New York & Idaho Falls, Idaho August 1990 |
Report Type: |
Final Report |
Report Number: |
GS-6961 Vol. 2 |
Project Number: |
2710-11 |
|
Subject: |
Fossil fuel power plants |
|
Prepared By: |
Niagra Mohawk Power Corporation & Stone and Webster Engineering Corporation |
Title: |
Control Upgrade for Huntley Unit 65 Vol. 3: Controls Analysis. Syracuse, New york & Boston, Massachusetts August 1990 |
Report Type: |
Final Report |
Report Number: |
GS-6961 Vol. 3 |
Project Number: |
2710-11 |
|
Subject: |
Fossil fuel power plants |
|
Prepared By: |
ENCOR-AMERICA, INC |
Title: |
Proceedings: GEN-UPDATE 90 Interational Symposium on Performance Improvement, Retrofitting, and Repowering of Fossil Fuel Plants Volume 1: Summary. Mountain View, California September 1990 |
Report Type: |
Proceedings |
Report Number: |
GS-6986, Volume 1 |
Project Number: |
|
|
Subject: |
Fossil fuel power plants |
|
Prepared By: |
ENCOR-AMERICA, INC |
Title: |
Proceedings: GEN-UPDATE 90 International Symposium on Performance Improvement, Retrofitting, and Repowering of Fossil Fuel Power Plants Volume 2: Upgrades and Retrofits. Mountain View, California September 1990 |
Report Type: |
Proceedings |
Report Number: |
GS-6986, Volume 2 |
Project Number: |
|
|
Subject: |
Fossil fuel power plants |
|
Prepared By: |
ENCOR-AMERICA, INC |
Title: |
Proceedings: GEN-UPDATE 90 International Symposium on Performance Improvement, Retrofitting, and Repowering of Fossil Fuel Power Plants, Volume 3: Policy, Economics, and Environmental Upgrades. Mountain View, California September 1990 |
Report Type: |
Proceedings |
Report Number: |
GS-6986, Volume 3 |
Project Number: |
|
|
Subject: |
Fossil fuel power plants |
|
Prepared By: |
ENCOR-AMERICA, INC |
Title: |
Proceedings: GEN-UPDATE 90 International Symposium on Performance Improvement, Retrofitting, and Repowering of Fossil Fuel Power Plants Volume 4: Repowering and Performance Improvement. Mountain View, California September 1990 |
Report Type: |
Proceedings |
Report Number: |
GS-6986, Volume 4 |
Project Number: |
|
|
Subject: |
Fuel cell power plants |
|
Prepared By: |
ARINC Research Corperation |
Title: |
A Computer-Aided Diagnostic and Troubleshooting System for Fuel Cell Power Plants. Annapolis, Maryland October 1990 |
Report Type: |
Final Report |
Report Number: |
GS-7039 |
Project Number: |
3061-3 |
|
Subject: |
Fuel cell power plants |
|
Prepared By: |
ARINC Research Corporation |
Title: |
A Computer-Aided Diagnostic and Troubleshooting System for Fuel Cell Power Plants. Annapolis, Maryland October 1990 |
Report Type: |
Final Report |
Report Number: |
GS-7039 (2) |
Project Number: |
3061-3 |
|
Subject: |
Gas Turbine Power Plants |
|
Prepared By: |
Science Applications International Corporation |
Title: |
A RAM Analysis of Consolidated Edison's Gowanus and Narrow Gas Turbine Power Plants. Los Altos, California December 1990 |
Report Type: |
Final Report |
Report Number: |
GS-7087 |
Project Number: |
2989-2 |
|
Subject: |
GCC power plants |
|
Prepared By: |
Flour Daniel, Inc. |
Title: |
Evaluation of a Dow-Based Gasification-Combined-Cycle Plant Using Bituminous Coal. Irvine, California June 1990 |
Report Type: |
Final Report |
Report Number: |
GS-6904 |
Project Number: |
2690-11 |
|
Subject: |
GCC power plants |
|
Prepared By: |
Shell Development Company |
Title: |
Shell Coal Gasification Project: Gasification of Six Diverse Coals. Houston, Texas November 1990 |
Report Type: |
Interim |
Report Number: |
GS-7051 |
Project Number: |
2695-1 |
|
Subject: |
GCC power plants |
|
Prepared By: |
Southern Company Services, Inc. |
Title: |
Southern Company Services' Study of a KRW-Based GCC Power Plant. Birmingham, Alabama July 1990 |
Report Type: |
Final Report |
Report Number: |
GS-6876 |
Project Number: |
2773-5 |
|
Subject: |
GCC power plants |
|
Prepared By: |
Cool Water Gasification Program and Radian Corp. |
Title: |
Cool Water Coal Gasification Program:Final Report. Daggett,California and Austin, Texas December 1990 |
Report Type: |
Final Report |
Report Number: |
GS-6806 |
Project Number: |
1459 |
|
Subject: |
GCC power plants |
|
Prepared By: |
Chem Systems, Inc. |
Title: |
Optimization of Electricity-Methanol Coproduction Configurations of Integrated-Gasification-Combined-Cycle/ Once-Through Methanol. Tarrytown, New York June 1990 |
Report Type: |
Final Report |
Report Number: |
GS -6869 |
Project Number: |
2771-1 |
|
Subject: |
GCC power plants |
|
Prepared By: |
Adelphi University |
Title: |
Physiochemical Priciples of Coal-Water-Slurry Gasifier Feedstocks. Garden City, New York November 1990 |
Report Type: |
Interim Report |
Report Number: |
GS/ER-7068 |
Project Number: |
8006-6 |
|
Subject: |
Geothermal power plants |
|
Prepared By: |
Pacific Gas and Electric Company |
Title: |
Modular Wellhead Binary Power System: Preliminary Design Results. San Francisco, California September 1990 |
Report Type: |
Final Report |
Report Number: |
GS-6890 |
Project Number: |
2195-6 |
|
Subject: |
Hydroelectirc Power Plants |
|
Prepared By: |
EA Engineering, Science, and Technology, Inc. |
Title: |
Instream Flow Methodologies. Lafayette, California September 1996 |
Report Type: |
Final Report |
Report Number: |
EA-4819 |
Project Number: |
2194-2 |
|
Subject: |
Manufactured gas plants |
|
Prepared By: |
Remediation Technologies, Inc. |
Title: |
Field Test of Manufactured Gas Plant Remediation Technologies" Material Removal and Handling. Pittsburgh, Pennsylvania November 1995 |
Report Type: |
Final Report |
Report Number: |
105146 |
Project Number: |
3072-04 |
|
Subject: |
Manufactured gas plants |
|
Prepared By: |
Remediation Technologies, Inc. |
Title: |
Field Test of Manufactured Gas Plant Remediation Technologies: Thermal Desorption. Pittsburgh, Pennslyvania November 1995 |
Report Type: |
Final Report |
Report Number: |
TR-105145 |
Project Number: |
3072-04 |
|
Subject: |
Manufactured gas plants |
|
Prepared By: |
Remediation Technologies, Inc. |
Title: |
Field Test of Manufactured Gas Plant Remediation Technologies: Material Removal and Handing. Pittsburgh, Pennslyvania November 1995 |
Report Type: |
Final Report |
Report Number: |
TR-105146 |
Project Number: |
3072-04 |
|
Subject: |
Manufactured gas plants |
|
Prepared By: |
Groundwater Technology, Inc. |
Title: |
Remediation Technologies for Groundwater at Manufactured Gas Plant Sites. Schenectady, New York December 1995 |
Report Type: |
Final Report |
Report Number: |
TR-105225 |
Project Number: |
3642-01 |
|
Subject: |
MHD power plants |
|
Prepared By: |
Westinghouse Advanced Energy Systems, Southern Electric International |
Title: |
Magnetohydrodynamic (MHD) Power Plant Interface Engineering. Pittsburgh, Pennsylvania, Birmingham, Alabama July 1990 |
Report Type: |
Final Report |
Report Number: |
GS-6825 |
Project Number: |
2466-10 |
|
Subject: |
Nuclear power plants |
|
Prepared By: |
Westinghouse Electric Corporatoin |
Title: |
Inspection Accessibility Study of the Millstone Unit 1 Reactor Pressure Vessel. Pittsburgh, Pennslvania July 1990 |
Report Type: |
Final Report |
Report Number: |
NP-6899-D Volume 1 |
Project Number: |
C105-1 |
|
Subject: |
Nuclear power plants |
|
Prepared By: |
Westinghouse Electric Corporatoin |
Title: |
Inspection Accessibility Study of the Millstone Unit 1 Reactor Pressure Vessel. Pittsburgh, Pennslvania July 1990 |
Report Type: |
Final Report |
Report Number: |
NP-6899-D Volume 2 |
Project Number: |
C105-1 |
|
Subject: |
Plants |
|
Prepared By: |
Stanford University |
Title: |
Reforestation to Offset Carbon Dioxide Emissions. Stanford, California July 1990 |
Report Type: |
Final Report |
Report Number: |
EN-6910 |
Project Number: |
3041-1 |
|
Subject: |
Polverized-coal plants |
|
Prepared By: |
Electric Power Research Institute |
Title: |
Proceedings: 1989 Conference on Technologies for Producing Electricity in the Twenty-First Century. Palo Alto, California 1989 |
Report Type: |
Proceedings |
Report Number: |
GS-6991s |
Project Number: |
|
|
Subject: |
Power plants |
|
Prepared By: |
|
Title: |
Surge Protection of Generators. October 1990 |
Report Type: |
Final Report |
Report Number: |
GS-6936 (2) |
Project Number: |
2594-1 |
|
Subject: |
Power plants |
|
Prepared By: |
Science Applications International Corporation |
Title: |
Development of Process Control Capability Through the Browns Ferry Integrated Computer System Using Reactor Water Cleanup System as an Example. Lynchburg, Virginia December 1995 |
Report Type: |
Final Report |
Report Number: |
TR-104378 |
Project Number: |
3351-02 |
|
Subject: |
Power plants |
|
Prepared By: |
Ontario Hydro and Rensselear Polytechnic Institute |
Title: |
Surge Protection of Generators. Toronto, Ontario,Canada: Troy, New York October 1990 |
Report Type: |
Final Report |
Report Number: |
GS-6936 |
Project Number: |
2594-1 |
|
Subject: |
Water pollution GCC power plants |
|
Prepared By: |
Radian Corporation |
Title: |
Texaco Coal Gasification Wastewater Handling and Treatment Pilot Plant; Volume 2: Wastewater Sampling and Analysis. Austin, Texas July 1990 |
Report Type: |
Final Report |
Report Number: |
GS-6819 Volume 2 |
Project Number: |
1459-30 |
|