EPRI Subject Search Results

Search Results for "Overhead transmission"

Subject: Overhead transmission
Prepared By: Colorado State University
Title:

Reliability-Based Design of Transmission Line Structures: Final Report Volume 1: Methods. Fort Collins, Colorado March 1987

Report Type: Final Report
Report Number: EL-4793 Volume 1
Project Number: Project 1352-2

 

Subject: Overhead transmission
Prepared By: Colorado State University
Title:

Reliability-Based Design of Transmission Line Structures: Final Report Volume 2: Appendixes. Fort Collins, Colorado Mach 1987

Report Type: Final Report
Report Number: EL-4793 Volume 2
Project Number: Project 1352-2

 

Subject: Overhead transmission
Prepared By: Sverdrup Technology, Inc.
Title:

TLWorkstation Code: Version 2.0; Volume 23: ETADS User's Manual. Haslet, Texas July 1990

Report Type: Final Report
Report Number: EL-6420 Volume 23
Project Number: 2016-3

 

Subject: Overhead transmission
Prepared By: Washingtom State University
Title:

TLWorkstation Code: Version 2.0 Volume 11: RNOISE Manual. Pullman, Washington June 1990

Report Type: Final Report
Report Number: EL-6420s Volume 10
Project Number: 2025

 

Subject: Overhead transmission
Prepared By: Environmental Consultants, Inc.
Title:

Advanced Tree-Trimming Equipment. Southampton, Pennsylvania July 1990

Report Type: Final Report
Report Number: EL-6901
Project Number: 2358-1

 

Subject: Overhead transmission
Prepared By: Sverdrup Technology
Title:

Upgrade Design for Wood H-Frame Structures Using the EPRI TLWorkstation. Haslet, Texas July 1994

Report Type: Final Report
Report Number: TR-102914
Project Number: 2016

 

Subject: Overhead transmission
Prepared By: General Electric Company
Title:

Electrical Performance of a Portable Protective Gap (PPG) in a Compact 550-kV Tower. Lenox, Massachusetts November 1994

Report Type: Final Report
Report Number: TR-103860
Project Number: 2472-06

 

Subject: Overhead transmission
Prepared By: Sverdrup Technology, Incorporated
Title:

Considerations for Measuring Wind Loads on Overhead Transmission Line Conductors in Field Conditions. Haslet, Texas December 1994

Report Type: Final Report
Report Number: TR-104478
Project Number: 3748

 

Subject: Overhead transmission
Prepared By: Sverdrup Technology, Incorporated
Title:

Evaluation of the Results of Several Full-Scale Conductor Wind Loading Experiments. Haslet, Texas December 1994

Report Type: Final Report
Report Number: TR-104479
Project Number: 3748

 

Subject: Overhead transmission
Prepared By: Sverdrup Technology, Inc.
Title:

Conductor Wind Loading- Results of EPRI Field Validation Studies. Haslet, Texas December 1994

Report Type: Final Report
Report Number: TR-104480
Project Number: 3748

 

Subject: Overhead Transmission Lines
Prepared By: High Voltage Transmission Research Center
Title:

Helicopter-Based Live-Line Work - Volume 1: Helicopter Platform Work Between Phases, Final Report. Lenox, Massachusetts June 1993

Report Type: Final Report
Report Number: TR-102318
Project Number: 2472-06

 

Subject: Overhead Transmission Lines
Prepared By: High Voltage Transmission Research Center
Title:

Helicopter-Based Live-Line Work - Volume 2: Bosun's Chair Work Near Suspension Insulators, Final Report. Lenox, Massachusetts June 1993

Report Type: Final Report
Report Number: TR-102318-2
Project Number: 2472-06

 

Subject: Overhead Transmission Lines
Prepared By: Mississippi State University
Title:

Improved Ammoniacal Copper Carboxylate Wood Preservative. Mississippi State, Mississippi September 1995

Report Type: Final Report
Report Number: TR-105372
Project Number: 1528-05