EPRI Subject Search Results

Search Results for "Inspection"

Subject: In-service inspection
Prepared By: Sonalysts Inc and Powerfect Inc
Title:

Feedwater Heaters Maintenance and Repair Technology: Reducing Outage Cosr. Waterford, Connecticut, Livingston, New Jersey August 1990

Report Type: Final Report
Report Number: GS-6935
Project Number: 2504-5

 

Subject: In-service inspection
Prepared By: EPRI
Title:

Nondestructive Evaluation Research Progress in 1989: Proceedings from the Tenth Annual EPRI NDE Information Meeting. Palo Alto, California June 1990

Report Type: Proceedings
Report Number: NP-6609
Project Number:

 

Subject: In-service inspection
Prepared By: J.A. Jones Applied Research Company
Title:

Proceedings: Steeam Turbine/ Generator NDE Workshop. Charlotte, North Carolina November 1990

Report Type: Proceedings
Report Number: NP-6993
Project Number: 1570-2

 

Subject: In-service inspection
Prepared By: High Voltage Transmission Research Center
Title:

Helicopter-Based Live-Line Work - Volume 1: Helicopter Platform Work Between Phases, Final Report. Lenox, Massachusetts June 1993

Report Type: Final Report
Report Number: TR-102318
Project Number: 2472-06

 

Subject: In-service inspection
Prepared By: High Voltage Transmission Research Center
Title:

Helicopter-Based Live-Line Work - Volume 2: Bosun's Chair Work Near Suspension Insulators, Final Report. Lenox, Massachusetts June 1993

Report Type: Final Report
Report Number: TR-102318-2
Project Number: 2472-06

 

Subject: In-service inspection
Prepared By: General Electric Company
Title:

Electrical Performance of a Portable Protective Gap (PPG) in a Compact 550-kV Tower. Lenox, Massachusetts November 1994

Report Type: Final Report
Report Number: TR-103860
Project Number: 2472-06

 

Subject: Inspection
Prepared By: VinTek Inc
Title:

BWR Nondestructive Evaluation Source Book. Richland, Washington June 1990

Report Type: Final Report
Report Number: NP-6879-D
Project Number: 1570-28

 

Subject: Inspection
Prepared By: Westinghouse Electric Corporatoin
Title:

Inspection Accessibility Study of the Millstone Unit 1 Reactor Pressure Vessel. Pittsburgh, Pennslvania July 1990

Report Type: Final Report
Report Number: NP-6899-D Volume 1
Project Number: C105-1

 

Subject: Inspection
Prepared By: Westinghouse Electric Corporatoin
Title:

Inspection Accessibility Study of the Millstone Unit 1 Reactor Pressure Vessel. Pittsburgh, Pennslvania July 1990

Report Type: Final Report
Report Number: NP-6899-D Volume 2
Project Number: C105-1

 

Subject: Inspection
Prepared By: J. A. Jones Applied Research Company
Title:

Assessment of Typical BWR Vessel Configurations adn Examination Coverage. Charlotte, North Carolina October 1990

Report Type: Topical Report
Report Number: NP-7026-D
Project Number: 3232-1

 

Subject: Inspection
Prepared By: Sargent & Lundy; & Encore Technical Resources, Inc.
Title:

Monitoring and Inspection of Low-Level Radioactive Waste Stored at Nuclear Power Plants. Chicago, Illinois; Middleton, Pennsylvania December 1995

Report Type: Final Report
Report Number: TR-195785
Project Number: 3800-12