EPRI Subject Search Results

Search Results for "Design"

Subject: Advanced construction design
Prepared By: Sargent & Lundy, L.L.C., Jason Consultants International, Inc., & Power Delivery Consultants, Inc.
Title:

Guidelines for the Design and Installation of Transmission and Distribution Cables Using Guided Drilling Systems. Chicago, Illinois, Washington, D.C., Ballston Lake, New York December 1995

Report Type: Final Report
Report Number: TR-105850
Project Number: 7925-01

 

Subject: Computer-aided design
Prepared By: Power Technologies, Inc.
Title:

Scoping Study: Substation Design Workstation. Wilmerding, Pennsylvania March 1993

Report Type: Final Report
Report Number: TR-101792
Project Number: 3191-01

 

Subject: Computer-aided design
Prepared By: Opercon Systems, Inc.
Title:

IntellCAD: Software to Enhance CAD and Database Management Systems for Power System Operation. Alameda, California May 1995

Report Type: Final Report
Report Number: TR-105080
Project Number: RP3573-14

 

Subject: Control system design
Prepared By: CEPEL--Centro de Pesquisas de Energia Electrica, University of Wisconsin
Title:

DC Multi-Infeed Study. Rio de Janeiro, Brazil, and Madison, Wisconsin December 1994

Report Type: Final Report
Report Number: TR-104586
Project Number: 2675-04, -05

 

Subject: Design
Prepared By: Cornell University
Title:

TLWorkstation Code: Version 2.0 Volume 16: CUFAD Manual. Ithaca, New York June 1990

Report Type: Final Report
Report Number: EL-6420 Volume 16
Project Number: 1493-6

 

Subject: Design
Prepared By: GAI Consultants, Inc
Title:

TLWorkstation Code: Version 2.0 Volume 17: MFAD Manual. Monroeville, Pennsylvania June 1990

Report Type: Final Report
Report Number: EL-6420 Volume 17
Project Number: 1493-7

 

Subject: Design
Prepared By: Georgia Institute of Technology
Title:

TLWorkstation Code: Version 2.0 Volume 8: DYNAMP Manual. Atlanta, Georgia June 1990

Report Type: Final Report
Report Number: EL-6420 Volume 8
Project Number: Project 2546-1

 

Subject: Design
Prepared By: Cornell University
Title:

Manual on Estimating Soil Properties for Foundation Design. Ithaca, New York August 1990

Report Type: Final Report
Report Number: EL-6800
Project Number: 1493-6

 

Subject: Design
Prepared By: GAI Consultants, Inc.
Title:

Direct Embedment Foundation Research: Load Tst Summaries. Monroeville, Pennsylvania June 1990

Report Type: Final Report
Report Number: EL-6849
Project Number: 1280-7

 

Subject: Design
Prepared By: Underground Systems, Inc.
Title:

Overload Characteristics of Paper-Polypropylene-Paper Cable. Armonk, New York September 1990

Report Type: Final Report
Report Number: EL-6929
Project Number: 7880-2

 

Subject: Design
Prepared By: Underground Systems, Inc.
Title:

Overload Characteristics of Paper-Polyproplene-Paper Cable. Armonk, New York September 1990

Report Type: Final Report
Report Number: EL-6929 (2)
Project Number: 7880-2

 

Subject: Design
Prepared By: Pirelli Cable Corporation
Title:

Development of 230-kV High Pressure, Gas-Filled, Pipe-Type Cable System: Model Test Program Phase. Florham Park, New Jersey September 1990

Report Type: Interim Report
Report Number: EL-6933
Project Number: 7908-1

 

Subject: Design
Prepared By: Cornell University
Title:

Field Evaluation of Grillage Foundation Uplift Capacity. Ithaca, New York August 1990

Report Type: Final Report
Report Number: EL-6965
Project Number: 1493-4

 

Subject: Design and evaluation
Prepared By: Duke Power Company
Title:

Guidelines and Criteria for Nuclear Piping and Support Evaluation and Design: Volume 9: Guidance on Load Definition and Load Combinations. Charlotte, North Carolina December 1995

Report Type: Final Report
Report Number: TR-101968-V9
Project Number: 2967-02

 

Subject: Digital control system design
Prepared By: CEPEL--Centro de Pesquisas de Energia Electrica, University of Wisconsin
Title:

DC Multi-Infeed Study. Rio de Janeiro, Brazil, and Madison, Wisconsin December 1994

Report Type: Final Report
Report Number: TR-104586
Project Number: 2675-04, -05

 

Subject: Foudation Design
Prepared By: Cornell University
Title:

Experimental Study of Undrained Behavior of Drilled Shafts During Static And Cyclic Inclined Loading. Ithica, New York July 1995

Report Type: Final Report
Report Number: TR-104999
Project Number: 1493-04

 

Subject: Foundation design
Prepared By: Cornell University
Title:

Reliability- Based Design of Foundations for Transmission Line Structures. Ithaca, New York July 1995

Report Type: Final Report
Report Number: TR-105000
Project Number: 1493-04

 

Subject: Foundation design
Prepared By: Cornell University
Title:

Summary of Transmission Line Structure Foundation Research. Ithaca, New York September 1995

Report Type: Final Report
Report Number: TR-105206
Project Number: 1493-04

 

Subject: Foundation design
Prepared By: Cornell University
Title:

Case History Evaluation of the Behavior of Drilled Shafts Under Axial and Lateral Loading. Ithaca, New York December 1994

Report Type: Final Report
Report Number: TR-104601
Project Number: 1493-04

 

Subject: Heat exchanger design
Prepared By: Public Service Company of Indiana
Title:

Geothermal Ground-Loop Preinstallation Project at Walden Pond. Plainfield, Indiana August 1990

Report Type: Final Report
Report Number: CU-6969
Project Number: 2892-6

 

Subject: Piping System Analysis and Design
Prepared By: Rockwell International
Title:

A Simplified Inelastic Seismic Analysis Method for Piping Systems. Canoga Park, California May 1990

Report Type: Final Report
Report Number: NP-6809
Project Number: 2350-2