| Subject: | Demand-side planning | |
| Prepared By: | Barakat & Chamberlin Inc | |
| Title: | Proceedings: Demand-Side Management Incentive Regulation. Oakland. California. May 1990 | |
| Report Type: | Proceedings | |
| Report Number: | CU-6840 | |
| Project Number: | 2982-2 |
| Subject: | Demand-side planning | |
| Prepared By: | Synergic Resources Corporation | |
| Title: | Cost and Performance Characteristics of Small Cogeneration Systems Volume 1: Summary Results. Bala Cynwyd, Pennsylvania. June 1990 | |
| Report Type: | Final Report | |
| Report Number: | CU-6842 Volume 1 | |
| Project Number: | 2950-1 |
| Subject: | Demand-side planning | |
| Prepared By: | Synergic Resources Corporation | |
| Title: | Cost and Performance Characteristics of Small Cogeneration Systems; Volume 2, Case Histories. Bala Cynwyd, Pennsylvania. June 1980 | |
| Report Type: | Final Report | |
| Report Number: | CU-6842 Volume 2 | |
| Project Number: | 2950-1 |
| Subject: | Demand-side planning | |
| Prepared By: | Barakat & Chamberlin, Inc. | |
| Title: | Least-Cost Planning in the United States: 1990. Oakland, California. September 1990 | |
| Report Type: | Final Report | |
| Report Number: | CU-6966 | |
| Project Number: | 2982-2 |
| Subject: | Distributed utility planning | |
| Prepared By: | Applied Decision Analysis, Inc. | |
| Title: | EPRI Investment Strategies Project - Volume 1: Value of Flexibility & Modularity of Distributed Generation. Menlo Park, California. October 1994 | |
| Report Type: | Final Report | |
| Report Number: | TR-104171 | |
| Project Number: | 1920-08 |
| Subject: | Distribution planning | |
| Prepared By: | Electric Power Software | |
| Title: | Cost Effectiveness Analysis of Amorphous Core Transformers Using EPRI DSManager. Minneapolis, Minnesota. October 1994 | |
| Report Type: | Final Report | |
| Report Number: | TR-104246 | |
| Project Number: | 3127-09 |
| Subject: | Distribution planning | |
| Prepared By: | Electrotek Concepts, Inc. | |
| Title: | Engineering Handbook for Dispersed Energy Systems on Utility Distribution Systems. Knoxville, Tennessee. November 1995 | |
| Report Type: | Final Report | |
| Report Number: | TR-105589 | |
| Project Number: | 4524-01 |
| Subject: | Financial planning | |
| Prepared By: | Barakat & Chamberlin Inc | |
| Title: | Proceedings: Demand-Side Management Incentive Regulation. Oakland. California. May 1990 | |
| Report Type: | Proceedings | |
| Report Number: | CU-6840 | |
| Project Number: | 2982-2 |
| Subject: | Fuel Planning | |
| Prepared By: | Jensen Associates, INC. | |
| Title: | Imported LNG as an Alternative Fuel. Boston, Massachusetts. November 1990 | |
| Report Type: | Final report | |
| Report Number: | OSCP-6871 | |
| Project Number: | 3201-2 |
| Subject: | Fuel Planning | |
| Prepared By: | Putnam, Hayes & Bartlett, Inc. and Energy Ventures Analysis | |
| Title: | Fuel Switching and Gas Market Risks Volume 1. Wshington, D.C. and Arlington, Virginia. July 1990 | |
| Report Type: | Final Report | |
| Report Number: | P-6822 Volume 1 | |
| Project Number: | 2369-42 |
| Subject: | Fuel Planning | |
| Prepared By: | Putname, Hayes & Bartlett, Inc. and Energy Ventures Analysis | |
| Title: | Fuel Switching and Gas Market Risks Volume 2. Washington, D.C. and Arlington, Virginia. July 1990 | |
| Report Type: | Final Report | |
| Report Number: | P-6822 Volume 2 | |
| Project Number: | 2369-42 |
| Subject: | Fuel Planning | |
| Prepared By: | Pace Consultants Inc. | |
| Title: | Utility Fuel Oil Market Trends: Ontlook for Residual and Distillate Fuel Oil. Houston, Texas. May 1990 | |
| Report Type: | Final Report | |
| Report Number: | P-6823 | |
| Project Number: | 2369 |
| Subject: | Fuel Planning | |
| Prepared By: | The Fieldston Company, Inc. | |
| Title: | Coal Supply and Transportation Markets During Phase One: Change, Risk and Opportunity. Washington, D.C.. January 1996 | |
| Report Type: | Final Report | |
| Report Number: | TR-105916 | |
| Project Number: | 4125-01 |
| Subject: | Investment planning | |
| Prepared By: | Applied Decision Analysis, Inc. | |
| Title: | EPRI Investment Strategies Project - Volume 1: Value of Flexibility & Modularity of Distributed Generation. Menlo Park, California. October 1994 | |
| Report Type: | Final Report | |
| Report Number: | TR-104171 | |
| Project Number: | 1920-08 |
| Subject: | Least-Cost planning | |
| Prepared By: | Barakat & Chamberlin, Inc. | |
| Title: | Least-Cost Planning in the United States: 1990. Oakland, California. September 1990 | |
| Report Type: | Final Report | |
| Report Number: | CU-6966 | |
| Project Number: | 2982-2 |
| Subject: | Operational Planning | |
| Prepared By: | Scientific Systems, Inc. | |
| Title: | Bulk Transmission System Loss Analysis Volume 1: Theory and Practice. Woburn, Massachusetts. May 1990 | |
| Report Type: | Final Report | |
| Report Number: | EL-6814 Volume 1 | |
| Project Number: | 2716-1 |
| Subject: | Planning | |
| Prepared By: | Policy Research Associates, Inc. | |
| Title: | Proceedings: Energy-Efficient Office Technology 1994: An International Seminar. Reston, Virginia. December 1995 | |
| Report Type: | Proceedings | |
| Report Number: | TR-105549 | |
| Project Number: | 2890-18 |
| Subject: | Power generation planning | |
| Prepared By: | Charles River Associates | |
| Title: | Competitive Procurement of Electric Utility Resources. Boston, Massachusetts. July 1990 | |
| Report Type: | Final Report | |
| Report Number: | CU-6898 | |
| Project Number: | 3086-1 |
| Subject: | Power generation planning | |
| Prepared By: | Resource Dynamics Corporation | |
| Title: | Cogeneration and Independent Power Production: Market Insight and Outlook. Vienna, Virginia. August 1990 | |
| Report Type: | Final Report | |
| Report Number: | CU-6964 | |
| Project Number: | 2950-2 |
| Subject: | Power generation planning | |
| Prepared By: | Southern Company Services, Inc. | |
| Title: | Southern Company Services' Study of a KRW-Based GCC Power Plant. Birmingham, Alabama. July 1990 | |
| Report Type: | Final Report | |
| Report Number: | GS-6876 | |
| Project Number: | 2773-5 |
| Subject: | Power generation planning | |
| Prepared By: | Stone and Webster Engineering Corporation | |
| Title: | The Production of Methanol by the Brookhaven National Laboratory Process. Houston, Texas. November 1990 | |
| Report Type: | Final Report | |
| Report Number: | GS-7038 | |
| Project Number: | 2146-6 |
| Subject: | Power generation planning | |
| Prepared By: | Daedalus Associates Inc, El international | |
| Title: | Life Optimization for Fossil Fuel Power Plants. November 1990 | |
| Report Type: | Final Report | |
| Report Number: | GS-7064 | |
| Project Number: | 2596-10 |
| Subject: | Power generation planning | |
| Prepared By: | ARINC Research Corporation | |
| Title: | Development of Warranties for Combustion Turbine Procurement. Annapolis, Maryland. November 1990 | |
| Report Type: | Final Report | |
| Report Number: | GS-7075 | |
| Project Number: | 2774-6 |
| Subject: | Power generation planning | |
| Prepared By: | Jensen Associates, INC. | |
| Title: | Imported LNG as an Alternative Fuel. Boston, Massachusetts. November 1990 | |
| Report Type: | Final report | |
| Report Number: | OSCP-6871 | |
| Project Number: | 3201-2 |
| Subject: | Power system planning | |
| Prepared By: | RCG/Hagler, Bailly, Inc. | |
| Title: | Cost-Benefit Analysis of Power System Reliability: Determination of Interruption Costs Volume 3: Measurement of Interruption Costs for a Major Southeast Utility. Washington, D.C.. May 1990 | |
| Report Type: | Final Report | |
| Report Number: | EL-6791 Volume 3 | |
| Project Number: | 2878-1 |
| Subject: | Power system planning | |
| Prepared By: | University of Oklahoma | |
| Title: | Multi-Area Power System Reliability and Production Costing. Norman, Oklahoma. August 1990 | |
| Report Type: | Final Report | |
| Report Number: | EL-6912 | |
| Project Number: | 2473-18 |
| Subject: | Power system planning | |
| Prepared By: | Power Systems Research Inc. | |
| Title: | Development of a Composite System Reliability Evaluation Program Volume 1: Methodology and Project Results. New York, New York. August 1990 | |
| Report Type: | Final Report | |
| Report Number: | EL-6926 Volume 1 | |
| Project Number: | 2581-2 |
| Subject: | Power system planning | |
| Prepared By: | Manitoba HVDC Research Centre | |
| Title: | The DC Modeling Program (DCMP): Version 2.0 Vol. 2: User's and Application Manual. Winnipeg, Manitoba, Canada. August 1990 | |
| Report Type: | Final Report | |
| Report Number: | EL-6959 Vol. 2 | |
| Project Number: | 1964-4 |
| Subject: | Power system planning | |
| Prepared By: | Manitoba HVDC Research Centre | |
| Title: | The DC Modeling Program (DCMP): Version 2.0 Vol. 3 Technical Manual. Winnipeg, Manitoba, Canada. August | |
| Report Type: | Final Report | |
| Report Number: | EL-6959 Vol. 3 | |
| Project Number: | 1964-4 |
| Subject: | Power system planning | |
| Prepared By: | Ontario Hydro | |
| Title: | Dynamic Reduction, Version 1.0 - Volume 1: Final Report. Toronto, Ontario, Canada. April 1993 | |
| Report Type: | Final Report | |
| Report Number: | TR-102234 | |
| Project Number: | 2447-01 |
| Subject: | Power system planning | |
| Prepared By: | Decision Systems International | |
| Title: | Proceedings: Dynamic Security Assessment and Voltage Stability -- Two Coordinated Workshops - Volume 1: Dynamic Security Assessment Workshop. Atlanta, Georgia. August 1993 | |
| Report Type: | Proceedings | |
| Report Number: | TR-102444 | |
| Project Number: | 2473-60 |
| Subject: | Power system planning | |
| Prepared By: | Decision Systems International | |
| Title: | Proceedings: Dynamic Security Assessment and Voltage Stability -- Two Coordinated Workshops - Volume 2: Voltage Stability Workshop. Atlanta, Georgia. August 1993 | |
| Report Type: | Proceedings | |
| Report Number: | TR-102444 V.2 | |
| Project Number: | 2473-60 |
| Subject: | Power system planning | |
| Prepared By: | The University of Wisconsin--Madison | |
| Title: | The Value of Transmission Security. Madison, Wisconsin. August 1994 | |
| Report Type: | Final Report | |
| Report Number: | TR-103634 | |
| Project Number: | 4000-14 |
| Subject: | Power system planning | |
| Prepared By: | West Virginia University | |
| Title: | Identification and Decentralized Control of Critical Modes in Electric Power Systems. Morgantown, West Virginia. October 1994 | |
| Report Type: | Final Report | |
| Report Number: | TR-103900 | |
| Project Number: | 4000-41 |
| Subject: | Power system planning | |
| Prepared By: | The Department of Electrical Engineering | |
| Title: | Dynamic Brake Control. Montana State University. September 1994 | |
| Report Type: | Final Report | |
| Report Number: | TR-103902 | |
| Project Number: | 2473-39 |
| Subject: | Power system planning | |
| Prepared By: | Santa Clara University | |
| Title: | Block Diagonal Decompositions for Parallel Computations of Large Power Systems. Santa Clara, California. May 1995 | |
| Report Type: | Final Report | |
| Report Number: | TR-105083 | |
| Project Number: | 8017-03 |
| Subject: | Power system planning | |
| Prepared By: | CSA Energy Consultants; Putnam, Hayes, and Bartlett | |
| Title: | Transmission Services Costing Framework; Volume 1: Technical and Economic Fundamentals. Arlington, Virginia; Washington, DC. April 1995 | |
| Report Type: | Final Report | |
| Report Number: | TR-105121-V1 | |
| Project Number: | 3216-01 |
| Subject: | Power system planning | |
| Prepared By: | CSA Energy Consultants; Putnam, Hayes and Bartlett | |
| Title: | Transmission Services Costing Framework; Volume 2: Framework Description and Application. Arlington, Virginia; Washington, DC. April 1995 | |
| Report Type: | Final Report | |
| Report Number: | TR-105121-V2 | |
| Project Number: | 3216-01 |
| Subject: | Power system planning | |
| Prepared By: | Power Technologies, Inc.; New York Power Authority | |
| Title: | Host Utility Study of System Operating Impacts of FACTS technologies. Schenectady, New York; New York, New York. August 1995 | |
| Report Type: | Final Report | |
| Report Number: | TR-105167 | |
| Project Number: | 3832-07; 3989-02 |
| Subject: | Power system planning | |
| Prepared By: | ABB Power T&D Company | |
| Title: | Expert System for Power System Planning and Engineering (ESP); Transient Stability Input and Output Data Analysis. Santa Clara, California. September 1995 | |
| Report Type: | Final Report | |
| Report Number: | TR-105188 | |
| Project Number: | 3128-01 |
| Subject: | Power system planning | |
| Prepared By: | School of Electrical and Computer Engineering | |
| Title: | Incorporating Detailed Dynamic Models in the Transient Energy Function (TEF) Method. Georgia Institute of Technology. September 1995 | |
| Report Type: | Final Report | |
| Report Number: | TR-105259 | |
| Project Number: | 2206-06 |
| Subject: | Power system planning | |
| Prepared By: | Washington University of St. Louis | |
| Title: | Application of Taxonomy Theory; Volume 1: Computing a Hopf Bifurcation-Related Segment of the Feasibility Boundary. St. Louis, Missouri. October 1995 | |
| Report Type: | Final Report | |
| Report Number: | TR-105492-V2 | |
| Project Number: | 3573-10 |
| Subject: | Power system planning | |
| Prepared By: | Zadeh Meyer Engineerng, Inc. | |
| Title: | Proceedings: Forum on Ancillary Services. 18371 Seventeenth Street, Santa Ana, California 92705. Septembre 1995 | |
| Report Type: | Proceedings | |
| Report Number: | TR-105686 | |
| Project Number: | 4169 |
| Subject: | Power system planning | |
| Prepared By: | University of Wisconsin-Madison | |
| Title: | Energy-Based Dynamic Security Assessment Tools for Maintaining Voltage Stability. Madison, Wisconsin. November 1995 | |
| Report Type: | Final Report | |
| Report Number: | TR-105796 | |
| Project Number: | 3103-04 |
| Subject: | Power system planning | |
| Prepared By: | GE Power Systems | |
| Title: | Power System Control Valuation Methodology. Schenectady, New York. December 1995 | |
| Report Type: | Final Report | |
| Report Number: | TR-106031 | |
| Project Number: | 3436-09 |
| Subject: | Power systems planning | |
| Prepared By: | Power Systems Research Inc. | |
| Title: | Development of a Composite System Reliability Evaluation Program vol.2:Mathematical Models and Computational Aspects. New York, New York. August 1990 | |
| Report Type: | Final Report | |
| Report Number: | EL-6926 Volume 2 | |
| Project Number: | 2581-2 |
| Subject: | Power systems planning | |
| Prepared By: | Power Systems Research Inc. | |
| Title: | Development of a Composite System Reliability Evaluation Program vol.3 User Manual and Instiation Notes. New York, New York. August 1990 | |
| Report Type: | Final Report | |
| Report Number: | EL-6926 Volume 3 | |
| Project Number: | 2581-2 |
| Subject: | Power systems planning | |
| Prepared By: | Manitoba HVDC Reearch Centre | |
| Title: | The DC Modeling Program (DCMP): Version 2.0. Winnipeg, Manitoba, Canada. August 1990 | |
| Report Type: | Final Report | |
| Report Number: | EL-6959 Vol. 1 | |
| Project Number: | 1964-4 |
| Subject: | Power systems planning | |
| Prepared By: | ASB Systems Control | |
| Title: | Prototype On-Line Dynamic Security Assessment (DSA) Program; User's Guide. Santa Clara, California. May 1995 | |
| Report Type: | Final Report | |
| Report Number: | TR-105082 | |
| Project Number: | 3103-02 |
| Subject: | Power sytem planning | |
| Prepared By: | Entergy Services Inc.; General Electric | |
| Title: | Flexible AC Transmission System (FACTS): System Studies to Assess FACTS Device Requirements on Entergy System. Little Rock, Arkansas; Schenectady, New York. August 1995 | |
| Report Type: | Final Report | |
| Report Number: | TR-105260 | |
| Project Number: | 3789-02 |
| Subject: | Research planning | |
| Prepared By: | Decision Focus International | |
| Title: | Evaluating Ehydro Relicensing Alternatives: Impacts on Power and Nonpower Values of Water Resources. Los Altos, California. August 1990 | |
| Report Type: | Final Report | |
| Report Number: | GS-6922 | |
| Project Number: | 2694-7 |
| Subject: | Resource planning | |
| Prepared By: | Charles River Associates | |
| Title: | Competitive Procurement of Electric Utility Resources. Boston, Massachusetts. July 1990 | |
| Report Type: | Final Report | |
| Report Number: | CU-6898 | |
| Project Number: | 3086-1 |
| Subject: | Resource planning | |
| Prepared By: | Resource Dynamics Corporation | |
| Title: | Cogeneration and Independent Power Production: Market Insight and Outlook. Vienna, Virginia. August 1990 | |
| Report Type: | Final Report | |
| Report Number: | CU-6964 | |
| Project Number: | 2950-2 |
| Subject: | Resource planning | |
| Prepared By: | Barakat & Chamberlin, Inc. | |
| Title: | Least-Cost Planning in the United States: 1990. Oakland, California. September 1990 | |
| Report Type: | Final Report | |
| Report Number: | CU-6966 | |
| Project Number: | 2982-2 |
| Subject: | Resource planning | |
| Prepared By: | Electric Power Research Institute | |
| Title: | Valuing Generation Assests in Uncertain Markets: An Introduction to Binomial Models. Palo Alto, California 94304. October 1995 | |
| Report Type: | Final Report | |
| Report Number: | TR-105523 | |
| Project Number: | 4024 |
| Subject: | Strategic planning | |
| Prepared By: | Jensen Associates, INC. | |
| Title: | Imported LNG as an Alternative Fuel. Boston, Massachusetts. November 1990 | |
| Report Type: | Final report | |
| Report Number: | OSCP-6871 | |
| Project Number: | 3201-2 |
| Subject: | Strategic planning | |
| Prepared By: | Putnam, Hayes & Bartlett, Inc. and Energy Ventures Analysis | |
| Title: | Fuel Switching and Gas Market Risks Volume 1. Wshington, D.C. and Arlington, Virginia. July 1990 | |
| Report Type: | Final Report | |
| Report Number: | P-6822 Volume 1 | |
| Project Number: | 2369-42 |
| Subject: | Strategic planning | |
| Prepared By: | Putname, Hayes & Bartlett, Inc. and Energy Ventures Analysis | |
| Title: | Fuel Switching and Gas Market Risks Volume 2. Washington, D.C. and Arlington, Virginia. July 1990 | |
| Report Type: | Final Report | |
| Report Number: | P-6822 Volume 2 | |
| Project Number: | 2369-42 |
| Subject: | Strategic planning | |
| Prepared By: | Pace Consultants Inc. | |
| Title: | Utility Fuel Oil Market Trends: Ontlook for Residual and Distillate Fuel Oil. Houston, Texas. May 1990 | |
| Report Type: | Final Report | |
| Report Number: | P-6823 | |
| Project Number: | 2369 |
| Subject: | Utility planning | |
| Prepared By: | Barakat & Chamberlin, Inc. | |
| Title: | Least-Cost Planning in the United States: 1990. Oakland, California. September 1990 | |
| Report Type: | Final Report | |
| Report Number: | CU-6966 | |
| Project Number: | 2982-2 |
| Subject: | Value-based Resource Planning | |
| Prepared By: | RCG/Hagler, Bailly, Inc. | |
| Title: | Cost-Benefit Analysis of Power System Reliability: Determination of Interruption Costs Volume 3: Measurement of Interruption Costs for a Major Southeast Utility. Washington, D.C.. May 1990 | |
| Report Type: | Final Report | |
| Report Number: | EL-6791 Volume 3 | |
| Project Number: | 2878-1 |